Cours d'anglais gratuitsRecevoir 1 leçon gratuite chaque semaine // Créer un test
Connectez-vous !

Cliquez ici pour vous connecter
Nouveau compte
Des millions de comptes créés.

100% gratuit !
[Avantages]


Comme des milliers de personnes, recevez gratuitement chaque semaine une leçon d'anglais !



- Accueil
- Aide/Contact
- Accès rapides
- Lire cet extrait
- Livre d'or
- Nouveautés
- Plan du site
- Presse
- Recommander
- Signaler un bug
- Traduire cet extrait
- Webmasters
- Lien sur votre site



> Nos sites :
-Jeux gratuits
-Nos autres sites
   


Apprendre l'anglais > Cours & exercices d'anglais > Exercices d'anglais > test d'anglais n°127179 : Dictée - Paris - Le Canal Saint Martin 1/2

> Plus de cours & d'exercices d'anglais sur les mêmes thèmes : | Confusions | Dictées | Mots [Autres thèmes]
> Tests similaires : - Bilan orthographique de base / débutants - Prétérit ou present perfect - Although / in spite of / despite - Adverbes : Still, yet et already - Attendre : wait/expect - Distinction entre Like et As - Again ou Back? - FOR-Savoir l'employer
> Double-cliquez sur n'importe quel terme pour obtenir une traduction...


Dictée - Paris - Le Canal Saint Martin 1/2



Ce test comporte un certain nombre d'erreurs grammaticales, d'orthographe, mais il n'y a jamais d'erreur au niveau des noms de personnages, du choix des mots ou de la syntaxe. Il faut essayer de les retrouver en cliquant dessus.


Dictée - Paris - Le Canal Saint Martin 1/2
Test réalisé par denis76
Bonjour et bienvenue !

 

 

Par une belle journée ensoleillée, je vous emmène sur les berges de :

Paris & le Canal Saint Martin.

(Première partie)

 

 

Sous l'Ancien Régime, les Parisiens ne bénéficient que d'un faible apport en eau potable et souvent de mauvaise qualité.
Napoléon Bonaparte en 1802 souhaite remédier à cette situation et par ailleurs limiter les épidémies (dysenterie & choléra)
dues aux mauvaises conditions d'hygiène. C'est ainsi qu'il relance un dessein datant du XVIe pour créer un réseau de canaux
afin d'alimenter les Parisiens en eau potable. Celui-ci doit également servir de voie fluviale pour transporter les
marchandises et matériaux de construction jusqu'au centre de Paris. Ce projet sera confié à l'ingénieur Pierre-Simon Girard.

 Pont tournant  Ecluse

Les travaux débutèrent en 1802 et s'achevèrent fin 1825. Les passerelles seront construites entre 1860 & 1890.
Mais quarante ans après sa création, le préfet Haussmann envisage de créer le boulevard Voltaire mais il se heurte à la présence du canal.
Afin de ne pas ralentir la circulation routière par un pont, il fut décidé d'abaisser le canal de 6 mètres. 

Le canal Saint Martin représente l'un des 3 canaux de la capitale avec ceux de Saint Denis et de l'Ourcq.
Il est le seul à se déployer intégralement dans la capitale.
Ce canal est long de 4.5 km dont 2 km en souterrain et présente un dénivelé de 25 mètres.
Il est jalonné par 9 écluses, 2 ponts tournants, 2 ponts fixes et 5 passerelles piétonnes.
 Canal Saint Denis

A suivre.../To be continued in Part 2  

 

 

Ce texte contient 10 erreurs.

Under the Ancien Régime, Parisians only had a small suply of drinking water and it was often of poor quality. In 1802, Napoleon Bonaparte wanted to remedy this situation and also to limit the epidemis (dysentery & cholera ) due to poor hygiene conditions. He therefore revived a project dating from the 16th century to create a nework of canals to supply Parisians with drinking water. This network was also to serve as a waterway for transporting goods and building materials to Paris centre. This project was entruted to the engineer Pierre-Simon Girard.
Work began in 1802 and was completed by the end of 1825. The footbridge were built between 1860 and 1890. Then forty years after its creation, the prefect Haussmann planed to create the Boulevard Voltaire but he came up againt the presence of the canal. In order not to slow down road traffic with a bridge, it was decided to louwer the canal by 6 metres.
The Saint Martin Canal is one of the three canals in the capital, along with those of Saint Denis and the Ourq. It is the only one to run entirly through the capital. This canal is four and a half kilometres long, 2 km of which are underground, and has a difference in level of 25 metres. It has 9 locks, 2 swing bridges, 2 fixed bridges and 5 pesdetrian bridges.

Cliquez sur les erreurs :
       







Fin de l'exercice d'anglais "Dictée - Paris - Le Canal Saint Martin 1/2"
Un exercice d'anglais gratuit pour apprendre l'anglais.
Tous les exercices | Plus de cours et d'exercices d'anglais sur les mêmes thèmes : | Confusions | Dictées | Mots










 


> INDISPENSABLES : TESTEZ VOTRE NIVEAU | GUIDE DE TRAVAIL | NOS MEILLEURES FICHES | Les fiches les plus populaires | Une leçon par email par semaine | Exercices | Aide/Contact

> INSEREZ UN PEU D'ANGLAIS DANS VOTRE VIE QUOTIDIENNE ! Rejoignez-nous gratuitement sur les réseaux :
Instagram | Facebook | Twitter | RSS | Linkedin | Email

> NOS AUTRES SITES GRATUITS : Cours de français | Cours de mathématiques | Cours d'espagnol | Cours d'italien | Cours d'allemand | Cours de néerlandais | Tests de culture générale | Cours de japonais | Rapidité au clavier | Cours de latin | Cours de provençal | Moteur de recherche sites éducatifs | Outils utiles | Bac d'anglais | Our sites in English

> INFORMATIONS : Copyright - En savoir plus, Aide, Contactez-nous [Conditions d'utilisation] [Conseils de sécurité] Reproductions et traductions interdites sur tout support (voir conditions) | Contenu des sites déposé chaque semaine chez un huissier de justice | Mentions légales / Vie privée | Cookies.
| Cours, leçons et exercices d'anglais 100% gratuits, hors abonnement internet auprès d'un fournisseur d'accès. | Livre d'or | Partager sur les réseaux